Case Studies

Nyack Christian College

After suffering widespread flooding in 2012 during Hurricane Sandy, Nyack Christian College had to alter installation plans for its new data facility. Originally slated for the basement of a converted apartment building, the server room had to be moved to a smaller office space upstairs.

To safeguard its critical equipment the college was seeking a cost-effective and reliable UPS with a small footprint. Given Eaton’s successful track record with Nyack, the college opted for an Eaton 5PX. Find out how the 5PX made the grade, saving the college money and space while delivering the efficiency and reliability they needed.

Download